







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateFast, Reliable ADU Design & Permits Across Shoreline
Shoreline homeowners come to us with a lot, a rough idea, and one question: what will the city actually let me build? We answer that with drawings, a permit package, and a construction plan built around your specific property. Our ADU design & permits team handles the whole path, from site review through final inspection, for families in Shoreline and the neighborhoods around it. Because we work only on ADUs and home additions, we’re tracking the city’s zoning updates and tree code as a matter of routine, not as a side project. Call (425) 645-3459 to start with a free estimate.
Why Shoreline Homeowners Call ADU Builder Everett for ADU Design & Permits

We’re ADU specialists, not generalists. That focus matters in Shoreline, where the rules changed in 2023 and the design constraints can be as much about trees as about walls. Our technicians have up to 12 years of experience, and the whole project stays with one company: design, permitting, and construction under one roof, so you’re not hiring a separate architect and then a permit expediter and then a builder who has never seen the drawings.
Shoreline clients tend to arrive after doing their homework. They’ve read the ordinance, they’ve measured their lot, and they want straight answers about what a permit will cost and what happens if the walls open up and something isn’t right. That’s the conversation we’re built for. We put allowances in the contract, we price surprises in writing before touching anything, and we keep the estimate honest from the first site visit.
We work with Abodu, Cover, and Dvele on the prefab side and build custom when the lot calls for it. Prefab or custom-built, the drawings still have to clear Shoreline’s review, and that’s where we spend the early effort. The local professional performing the work is licensed and insured as their state requires. Estimates are free, and every quote is written line by line.
Our ADU Design & Permits Services in Shoreline
Three of our services carry most Shoreline projects. Each one is shaped by the same local reality: the permit is where the budget actually gets decided.
ADU Design & Permitting
Shoreline’s 2023 ordinance allows two attached or detached ADUs per lot, with no owner-occupancy requirement and no parking mandate. That opens options most homeowners didn’t have before. But the first real constraint on most permits here is the city’s tree canopy code, which protects mature Douglas firs and bigleaf maples, so our site planning starts with root protection zones and utility routes before we draw a single wall. Get that step wrong and you’re redesigning late with a tree replacement on the bill.
Junior ADU & Interior Conversion
Many Shoreline ramblers already have a finished basement apartment from the 1960s or ’70s. Turning that into a legal ADU is usually not a paperwork exercise. It starts with discovery: an electrician and inspector trace the older wiring to see whether it supports a kitchen and bath, egress gets measured against current code, and any legacy unpermitted kitchen or substandard window well gets flagged before drawings go in. Our ADU design & permits process treats that inspection as the first deliverable, not an afterthought.
ADU Site Prep & Utilities
Shoreline’s marine climate drops 37+ inches of rain a year, and drainage is where budget quietly disappears. Detached ADUs here need gutters and site drainage designed for that volume, and walls need proper rain screens. We also account for the drier, warmer summers, which increasingly push clients to site a unit so it keeps existing canopy for shade. Trenching near protected roots is planned around, not through.
Prefab and Custom Construction
If speed-to-completion and design consistency matter to you, a prefab unit from Cover or Dvele can be the cleaner answer. If the lot’s grade, tree cover, or a daylight basement makes a factory footprint awkward, we design custom. Right-size your ADU first, pick the method second.
Trusted Brands We Service in Shoreline
We’re authorized to work with Abodu, Cover, and Dvele, and we bring those brands into Shoreline projects when the site and the goals line up. What that means for you is real choice: a design-forward prefab unit or a custom build, not one product pushed on every lot. Each brand has its own plan set and its own review path, and we fold those drawings into the Shoreline permit package rather than starting from a blank page. You’ll see the differences in cost and schedule laid out in your written estimate before you commit.
Common ADU Design & Permits Problems We See in Shoreline Homes
Most of the surprises on a Shoreline ADU trace back to one of four things. Here’s what we look for and how we handle each.
- Drawings submitted before an electrical and framing inspection. The permit then uncovers legacy 1960s-’70s wiring and undersized framing that the original design budget never carried. We inspect first so the drawing reflects what’s actually there.
- Site plans that ignore the tree canopy code. An ADU footprint or utility trench landing inside a protected Douglas fir or bigleaf maple root protection zone forces a redesign and tree replacement late in permitting. We map root zones before the first sketch.
- Basement conversions that assume the old apartment is ready to upgrade. An unpermitted kitchen and substandard egress have to be corrected and re-permitted before the unit can legally be called an ADU. Better to find that at the start.
- Waterproofing and drainage assumed rather than designed. With 37+ inches of rain a year, a failed detail shows up fast. Walls get rain screens, roofs get gutters sized for the volume, and grade gets drained away from the unit.
Pricing for ADU Design & Permits in Shoreline, WA

Here are the typical estimated ranges we see in Shoreline’s market. The written estimate sets the final price, and every line is itemized so you can see where the money goes.
| Service | Typical Estimated Range |
|---|---|
| ADU Design & Permitting | $6,000 – $25,000 |
| Junior ADU & Interior Conversion | $40,000 – $90,000 |
| ADU Site Prep & Utilities | $15,000 – $50,000 |
| New Detached ADU (full build) | $180,000 – $350,000 |
| Garage Conversion ADU | $80,000 – $180,000 |
| Home Addition | $45,000 – $130,000 |
What moves a number inside those ranges: whether the lot needs a tree-protection plan, how old the wiring is, whether egress must be rebuilt, and how far utilities have to run. Because a Shoreline permit triggers code upgrades once walls come open, we write allowances into the contract for framing and waterproofing. If a surprise surfaces, it’s priced and approved in writing before we touch it. Call (425) 645-3459 for a free estimate.
We Also Serve Cities Near Shoreline
Shoreline is our target area for this work, and we also take on ADU design and permitting for homeowners in Lake Forest Park, Mountlake Terrace, Kenmore, and Woodway. Each of those cities has its own zoning and tree rules, and we adjust the site plan accordingly. If you’re just outside Shoreline’s line, call and we’ll tell you whether we can help.
Serving Shoreline, WA – Our Local Coverage Area
We serve Shoreline and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – ADU Design & Permits in Shoreline

Yes. The 2023 ordinance allows two attached or detached ADUs per lot with no owner-occupancy requirement and no parking mandate, and that changes what’s even worth drawing. Your package now needs to consider how a second unit shares utilities and access, and it still has to satisfy the city’s tree canopy code. We confirm the current rules with the city’s planning department before finalizing plans. Call (425) 645-3459 to talk through your lot.
Not automatically. A finished basement apartment from decades ago is often unpermitted, and egress frequently falls short of current code. The unit has to be corrected and re-permitted before it can legally be called an ADU. We start with an inspection so you know exactly what’s needed. Call (425) 645-3459 for an exact quote; estimates are free.
Because a permit requires the opened walls to meet current code, not the code from when the house was built. Legacy wiring, undersized framing, and failed waterproofing all get caught in an inspection-first scope. We write allowances into the contract so any surprise is priced and approved in writing before work starts. Call (425) 645-3459 to scope your project.
Two ways. With 37+ inches of annual rain, roofs, gutters, drainage, and rain screens all have to be designed for the volume rather than assumed. And because the city protects mature Douglas firs and bigleaf maples, the footprint and utility trench are planned around root protection zones. Get either wrong and the redesign costs more than the fix. Call (425) 645-3459 to start your site review.
We’re authorized to work with Abodu, Cover, and Dvele, and each brings its own plan set into the package. We also design custom when the lot or the goals call for it. Prefab or custom-built, the drawings still have to clear Shoreline’s review, and we handle that step. Call (425) 645-3459 to compare options.
Ready to Start Your Shoreline ADU?
Send us your address and a rough idea of what you want, and we’ll come out, look at the lot, and tell you what the city will actually approve. Design, permitting, and construction stay with one company from permit to move-in, with a fixed written estimate and no change orders. Call (425) 645-3459 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at ADU Builder Everett.












