







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateHow Much Does an ADU Cost in Lake Stevens?
An ADU in Lake Stevens typically costs $180,000 – $350,000 for a new detached unit in 2026. A garage conversion ADU runs $80,000 – $180,000, a junior ADU (JADU) or interior conversion runs $40,000 – $90,000, and design and permitting alone runs $6,000 – $25,000. Those are the estimated ranges we work from, and the written estimate sets your final price.
Lake Stevens is a market where the cheap path and the right path can look similar on paper. What separates them is a plan that matches the lot, the utility hookups, and your goal for the space. We build ADUs and nothing else, so we spend our days on exactly these numbers.
Key Takeaways
- New detached ADU: $180,000 – $350,000 typical.
- Garage conversion ADU: $80,000 – $180,000 typical.
- JADU or interior conversion: $40,000 – $90,000 typical.
- Design and permitting: $6,000 – $25,000 typical.
- Site prep and utilities: $15,000 – $50,000, and the single item most likely to move your total.
- Estimates are free. Call (425) 645-3459. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.

ADU Cost Breakdown (2026)
Here’s how the money splits across the project types we build in Lake Stevens. These are typical estimated ranges for the local market. They are not a quote; your written estimate is.
| Project type | Typical estimated range | What’s included |
|---|---|---|
| New detached ADU | $180,000 – $350,000 | Ground-up unit with its own foundation, roof, kitchen and bath |
| Garage conversion ADU | $80,000 – $180,000 | Converting an existing garage to living space, plus insulation, plumbing and finishes |
| Junior ADU & interior conversion | $40,000 – $90,000 | Unit built within the existing footprint, sharing some systems with the house |
| ADU site prep & utilities | $15,000 – $50,000 | Grading, foundation work, water, sewer, electrical and gas connections |
| ADU design & permitting | $6,000 – $25,000 | Drawings, engineering, and the permit package submitted to the city |
| Home addition | $45,000 – $130,000 | Adding living space to the main structure |
| Kitchen remodel (in an ADU) | $14,000 – $45,000 | Cabinets, counters, appliances, plumbing and finishes |
| Bathroom remodel (in an ADU) | $9,000 – $28,000 | Fixture rough-in, tile, vanity and finishes |
Two things drive the spread more than anything else: project type and site conditions. A garage conversion or JADU sits at the low end because the walls, roof and foundation already exist. A detached unit has to build all of that from nothing, so the same square footage costs considerably more. Site prep and utility connections are the wild card. A flat lot with a sewer main within reach is a different project than a sloped lot that needs grading, retaining, and a long utility run. That’s why we don’t quote ADUs off a price sheet. We quote them off the lot, after we’ve looked at it.
What Affects ADU Pricing in Lake Stevens
The Lake Stevens market has its own cost profile. Here are the factors that move a number the most.
- Lot shape and slope. Lake Stevens has plenty of lots that sit on a grade rather than flat. A slope means grading, retaining walls or a stepped foundation, and every one of those adds to site prep.
- Utility distance. The farther the ADU sits from your existing water, sewer and electrical service, the more trenching and wire you’re paying for. On a deep lot, this can be the difference between a comfortable budget and a stretched one.
- Project type. A JADU or garage conversion reuses what’s already standing and usually lands at a fraction of a detached build. Starting with the conversion question is how a lot of Lake Stevens homeowners find their realistic budget.
- Wet weather and scheduling. Snohomish County gets a lot of rain from fall through spring. Concrete pours, excavation and exterior finishing all depend on the weather window. Building that into the schedule keeps the budget honest instead of turning a delay into a change order.
- Finish level. A unit built to rent to a tenant and a unit built for a family member can share a footprint and a foundation and still land tens of thousands apart in finishes and fixtures.
- Permit and code requirements. The rules depend on the city and on your specific lot. We confirm those requirements with the city’s planning and building department before plans are final, so the design you pay for is the design that gets built.
One more factor that’s easy to overlook: which ADU format fits your lot in the first place. That decision, made early, usually saves more than any finish choice made late.

Which ADU Format Fits Your Budget?
The cheapest ADU isn’t always the smallest one. It’s the one that fits your lot without forcing expensive site work.
Garage conversion ADUs
This is the most common lower-cost entry point we see in Lake Stevens. Your garage has a foundation and a roof. Converting it means insulation, moisture control, plumbing, electrical and finishes, which is why the typical range lands at $80,000 – $180,000 instead of the detached figure. It also solves a problem a lot of homeowners have: a garage used for storage that could become a living space.
Junior ADUs and interior conversions
A JADU builds a self-contained unit inside the existing footprint, and it’s the least expensive path at $40,000 – $90,000 typical. It suits multigenerational living well, or a homeowner who wants rental income without new exterior construction.
Detached ADUs
At $180,000 – $350,000, this is the full build: its own structure, its own systems, and the most flexibility on size and layout. For clients who prioritize speed to completion and design consistency, prefab options from Abodu, Cover and Dvele are worth a serious look alongside a custom build. We’re authorized to work with all three, so you can compare a factory-built unit and a site-built one side by side, with the same team handling either.
Home additions
Sometimes the right answer is attached living space rather than a separate unit. A home addition runs $45,000 – $130,000 typical and keeps one roof over the whole family, which some homeowners prefer for an aging parent or a returning adult child.
What Does Design and Permitting Cost in Lake Stevens?
Design and permitting typically runs $6,000 – $25,000 in the Lake Stevens market. That covers the drawings, engineering, and the permit package that goes to the city.
We handle this part in-house, and that matters for the budget. When the permit designer and the builder are the same team, the plans get drawn with construction cost in mind. A design that requires a variance, a structural workaround or an unusual utility approach costs more to build, and it’s better to know that on paper than after a permit is issued. We confirm the rules with the city’s planning and building department before plans are final, so that step isn’t left for you to chase. Our technicians have up to 12 years of experience working through this part of the process.
If you’re still at the research stage, the ADU Builder Everett page is a good place to see how the full project path fits together.
How to Save on an ADU in Lake Stevens
There’s no shortcut around permits or site work, but there are real ways to keep a Lake Stevens ADU budget in check.
- Decide the format first. If a JADU or a garage conversion meets your goal, it lands far below the detached figure. Right-sizing the project to the lot beats trimming finishes later.
- Site the unit to shorten utility runs. Placing the ADU near your existing service connections can cut site prep meaningfully. This is a design decision, and it’s cheapest made early.
- Keep the footprint efficient. A well-planned unit that uses its square footage well usually costs less than a larger unit with wasted space. Layout matters more than raw size.
- Step the finish level, don’t cut the structure. Spend on the foundation, the envelope and the waterproofing. Trim the countertop. Structure is the part you can’t upgrade later without tearing the unit apart.
- Choose one team for the whole path. Every handoff between an architect, a permit expediter and a builder is a chance for a forgotten item to reappear as a change order. Keeping design, permitting and construction together closes that gap.
- Start with a written estimate, not a rule of thumb. Estimates are free, and a written number tells you exactly where your project stands. Call (425) 645-3459.
Why the Scope of the ADU Firm Changes the Price
Two ADU projects can have the same plan and different prices based on how the work is organized. When the firm designing the unit is not the firm building it, assumptions in the drawings get discovered on site, and those discoveries are change orders. When one team owns design, permitting and construction, the plan is priced against real construction cost from the start.
That’s the reason we specialize rather than generalize. Every zoning update and financing nuance in the ADU world gets tracked, because ADUs are the whole job, not a side project between kitchen remodels. Five project types live under one roof: detached ADUs, garage conversions, junior ADUs, home additions, and standalone design-and-permit services. If you want to see how we approach a nearby market, the ADU cost in Snohomish guide covers similar ground.
Ready to Price Your Lake Stevens ADU?
Pricing an ADU in Lake Stevens is a conversation about your lot, your goal and your budget, not a number pulled from a table. The table above tells you where each project type typically lands. The written estimate tells you where yours lands. Call (425) 645-3459 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
FAQs – ADU Cost in Lake Stevens
How much does an ADU cost in Lake Stevens?
A new detached ADU in Lake Stevens typically costs $180,000 – $350,000, while a garage conversion ADU runs $80,000 – $180,000 typical and a JADU or interior conversion runs $40,000 – $90,000 typical. Call (425) 645-3459 for an exact quote on your lot. Estimates are free.
Is it cheaper to convert a garage or build a detached ADU?
A garage conversion is typically cheaper, landing at $80,000 – $180,000 versus $180,000 – $350,000 for a new detached unit, because the foundation, walls and roof already exist. Call (425) 645-3459 to talk through which fits your lot. Estimates are free.
How much does ADU design and permitting cost in Lake Stevens?
Design and permitting typically runs $6,000 – $25,000, covering drawings, engineering and the permit package. We handle this in-house and confirm the rules with the city’s planning and building department before plans are final. Call (425) 645-3459 for a written estimate.
Are there cheaper ADU options than a full detached build?
Yes. A JADU or interior conversion typically runs $40,000 – $90,000, and a garage conversion runs $80,000 – $180,000, both well below a detached build. Right-sizing the project to your lot is the biggest cost lever you have. Call (425) 645-3459 to review the options. Estimates are free.
How much of the ADU budget goes to site prep and utilities?
Site prep and utilities typically run $15,000 – $50,000 in Lake Stevens, and it’s the item most likely to shift your total, depending on lot slope and distance to existing water, sewer and electrical service. Call (425) 645-3459 for an estimate based on your actual lot.
Do you offer prefab ADU options in Lake Stevens?
Yes. We’re authorized to work with Abodu, Cover and Dvele, so you can compare a factory-built unit against a custom build. Prefab is worth considering if speed to completion and design consistency are priorities. Call (425) 645-3459 to compare both paths.
Pricing reflects the Lake Stevens market as of 2026. ADU Builder Everett offers free estimates – call (425) 645-3459.
Written by the team at ADU Builder Everett.
What Our Customers Say
"He was honest that our lot had a slope problem that would add real cost, before we signed anything."
- Miguel Morales"He gave us a realistic rental number for the finished unit rather than the optimistic one, and it's renting for about what he said."
- Scott Sutton"Good build quality. Budget landed about eight percent over, which for a project this size is reasonable, but it was more than the contingency we'd been told to plan for."
- Tracy Anderson











